Brighton University
Laboratory gas installation completed in the Cockcroft Building
![](https://khmedical.co.uk/wp-content/uploads/2022/10/xbrighton-uni.jpeg.pagespeed.ic.nl8sP5sGc5.jpg)
Laboratory gas installation has recently been completed in the Cockcroft Building at Brighton University to provide new supplies of Argon, Compressed air, Hydrogen, Nitrogen and Zero Grade Air.
K&H Medical Ltd was required to install new medical gas Manifold system equipment for each service. Grade 316 high purity Stainless Steel now provides all gas services to a major Lab on the 7th floor including two spare pipelines for future use. A new Alarm panel to monitor all services running to the Lab was also installed. The Cockcroft Building provides 15,000m2 of multi-use space and is one of the University’s largest academic buildings.
Quick facts
- Site: Brighton University, Brighton
- Project value: £80,645
- Project details: Laboratory gas installation