Springfield Hospital

Theatres 5 & 6 and Recovery

Download our latest brochure
 

Springfield Hospital has recently undergone a major extension project to include two new Theatres, a new 4 Bed Pre-Op area, a new 11 Bed 2nd Stage Recovery area and a new Treatment Room.

K&H Medical Ltd was appointed to provide the new Medical Gas services to these new areas.

Extensive routing of new Medical Gas pipework within these areas serve newly installed equipment including two 5-Gas AVSU Modules, one serving Theatre 5 and one serving Theatre 6. There is also one 4-gas AVSU Module serving the Treatment Room and Terminal Units at each bed space within the Pre-Op area, 2nd Stage Recovery, two Anaesthetic Rooms and the Treatment Room.

A total of 48 new Terminal Units have been installed. K&H Medical Ltd is very happy with the completed installation and are looking forward to providing Medical Gas installations to the 12 Bed 1st Stage Recovery Area in the very near future.

Quick facts

  • Site: Springfield Hospital, Essex
  • Project value: £108,000
  • Project details: Theatres 5&6 and recovery medical gases